> ## Knowledge Base Index
> Fetch the complete knowledge base index at: https://wiser.airwallet.net/sitemap.xml
> Use this file to discover available pages before exploring further.
> Pure-Markdown content can be obtained by appending a '.md' suffix to the content URLs listed in the sitemap (without the trailing slash).

# ASKO - WMC Washers & TDC Dryers with EADBS module

### Installation videos

---

### Recommended dashboard setup

Fixed ➜ User start time: 15 min.  

Busy signal: High

---

### Recommended machine setup

Go into the service menu ➜ External systems ➜ Beas ➜ enabled  

  

Make sure that Payment System from settings is OFF

---

### Wiring diagram

| **No.** | **AW PRO310 or higher** | **Wiring diagram** |
| --- | --- | --- |
| 1 | Wire no. 1 | Line |
| 2 | Wire no. 2 | Neutral |
| 3 | Wire no. 3 | +12V\_In |
| 4 | Wire no. 4 | Con (WM Status) |
| 5 | Wire no. 5 | +12V\_In |
| 6 | Wire no. 6 | WORK (WM STATUS) |
| 7 | Wire no. 7 | GND\_In |

Attention: Move wire no. 5 from the AC-feedback terminal to the 24V-out terminal and wire no. 7 from the NC terminal to the GND terminal in the Airwallet box.

![](https://storage.crisp.chat/users/helpdesk/website/8fbd610f32d91000/diagramtdc4x_ajf4rk.png)