> ## Knowledge Base Index
> Fetch the complete knowledge base index at: https://wiser.airwallet.net/sitemap.xml
> Use this file to discover available pages before exploring further.
> Pure-Markdown content can be obtained by appending a '.md' suffix to the content URLs listed in the sitemap (without the trailing slash).

# Fagor - Concept

### Installation videos

${youtube}[Fagor industrial dryer - Airwallet PRO200](_wvFBlZYSmM)

---

### Recommended dashboard setup 

Variable ➜ Pulse operated + Time controlled
Pulse length: 200 ms., Pulse repetition: 1, Time increment: 10 min.

---

### Recommended machine setup 

Set the dip-switch on the machine to 111100, which correlates to 10 min increment pr. pulse.

---

### Wiring diagram

| **No.** | **AW PRO310 or higher** | **Wiring diagram** |
| ---- |
| 1 | Wire no. 1 | L1 |
| 2 | Wire no. 2 | N |
| 3 | Wire no. 3 | Brn |
| 4 | Wire no. 4 | Wht |
| 5 | Wire no. 5 | Not in use |
| 6 | Wire no. 6 | Not in use |
| 7 | Wire no. 7 | Not in use |


![](https://storage.crisp.chat/users/helpdesk/website/8fbd610f32d91000/diagram32x_cbvnsa.png)