ASKO - WMC Washers & TDC Dryers with EADBS module
Installation videos
Recommended dashboard setup
Fixed ➜ User start time: 15 min.
Busy signal: High
Recommended machine setup
Go into the service menu ➜ External systems ➜ Beas ➜ enabled
Make sure that Payment System from settings is OFF
Wiring diagram
No. | AW PRO310 or higher | Wiring diagram |
|---|---|---|
1 | Wire no. 1 | Line |
2 | Wire no. 2 | Neutral |
3 | Wire no. 3 | +12V_In |
4 | Wire no. 4 | Con (WM Status) |
5 | Wire no. 5 | +12V_In |
6 | Wire no. 6 | WORK (WM STATUS) |
7 | Wire no. 7 | GND_In |
Busy Signal Setup
__Attention: __ For Airwallet devices (PRO300 with 7 wires ONLY!) Airwallet devices with 8 wires (PRO340 or Universal Harness) Do not require this modification
If using the BUSY signal from the machine, you MUST move wire no. 5 from port 10 to port 7 inside the Airwallet unit

Airwallet Ground Setup
This step is required for all Airwallet units
On all Airwallet units wire no. 7 must be moved internally from the NC terminal to the GND terminal in the Airwallet box.
Airwallet Installation Connections

Updated on: 08/10/2026
Thank you!