ASKO - WMC washers with EADBS module
Not sure which Airwallet unit you have? See Which Airwallet unit do you have?.
For ASKO WMC washers with the EADBS module.
Dashboard setup
- Fixed ➜ User start time: 15 min.
- Busy signal: High
Machine setup
- Service menu ➜ External systems ➜ Beas ➜ enabled
- Payment System (in settings): OFF
Wiring diagram
No. | PRO310–330 | PRO340 | Wiring diagram |
|---|---|---|---|
1 | Wire no. 1 | Wire no. 1 | Line |
2 | Wire no. 2 | Wire no. 2 | Neutral |
3 | Wire no. 3 | Wire no. 3 | +12V_In |
4 | Wire no. 4 | Wire no. 4 | Con (WM Status) |
5 | Wire no. 5 (moved to port 7) | Wire no. 8 | +12V_In |
6 | Wire no. 6 | Wire no. 6 | WORK (WM STATUS) |
7 | Wire no. 7 (moved from NC to GND) | Wire no. 7 (moved from NC to GND) | GND_In |
8 | No wire 8 | Wire no. 5 | Not in use |
Inside the Airwallet unit
Every Airwallet unit must be opened, the PRO340 included.- PRO310–330: move wire no. 5 from the AC feedback terminal to the 24V out terminal (port 7), and wire no. 7 from the NC terminal to the GND terminal.
- PRO340 or Universal Harness: move wire no. 7 from the NC terminal to the GND terminal. Wire no. 5 is not moved: use wire no. 8 in its place.

Connections

Installation video
Updated on: 16/11/2026
Thank you!