Pro340 installation guide on IPSO WE73 washer
This guide explains how to connect the Pro340 to IPSO WE73 washer.
Pro340 wires
Pro340 wire | Name used in this guide |
|---|---|
Wire 1 | ACL |
Wire 2 | ACN |
Wire 3 | COM |
Wire 4 | Output NO |
Wire 5 | Feedback |
IPSO WE73 – 16 lb washer (fitted with CPC900 totaliser)
Machine details
- Setup: Fixed, pulse operated
- Pulse length: 80–100 ms
- Busy signal: High
Connect the Pro340
- Connect COM (wire 3) onto the totaliser terminal 2
- Connect Output NO (wire 4) onto the totaliser terminal 4
- Connect ACL (wire 1) directly onto the L input at the back of the machine
- Connect ACN (wire 2) directly onto the N input at the back of the machine
- Connect Feedback (wire 5) onto the L wire to the operating light
Totalizer Connections
Operating light for feedback
Operating light terminals
Completed install
Updated on: 12/10/2026
Thank you!